EasyManua.ls Logo

SMC Networks HRSH100-A 20 Series - Preparation for Operation

SMC Networks HRSH100-A 20 Series
204 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HRX-OM-Q026
Chapter 3 Transport and Setting Up
3.3 Installation HRSH Series
3-16
Preparation for operation
1. Remove four screws to remove the front panel for the electrical unit.
Fig. 3-6 Remove the front panel for the electrical unit (This drawing shows air cooled type.)
Fig. 3-7 Remove the front panel for the electrical unit (This drawing shows water cooled type.)
Screw
Front panel for the
electrical unit
For HRSH-A-20-B1,
HRSH-A-20-S,
HRSH-A-40-
OFF
Note: Turn off the earth
leakage breaker. The
front panel of the
electrical unit cannot
be removed without
turning off the
breaker.
Front panel
Screw
For HRSH-W-20-B1,
HRSH-W-20-S,
HRSH-W-40-
Note: Turn off the earth
leakage breaker. The
front panel of the
electrical unit cannot
be removed without
turning off the
breaker.
OFF

Table of Contents

Related product manuals