HRX-OM-Q026 
Chapter  3   Transport  and  Setting  Up 
 
3.3 Installation  HRSH Series 
 
  3-14 
3.3.3 Preparation and wiring of power supply cable 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Be sure to lock out and tag out the breaker of the facility power supply 
(customer power supply facility) before wiring. 
  The electrical facilities should be installed and wired in accordance 
with local laws and regulations of each country and by a person 
who has knowledge and experience. 
  Check the power supply. Operation with voltages, capacities and 
frequencies other than the specified values can cause fire and 
electric shock. 
  Wire with an applicable cable size and terminal. Forcibly mounting 
with an unsuitably size cable may result in heat generation or fire. 
Be sure to connect the power supply cable from the product side first, 
and then connect the breaker of the facility power supply (the user’s 
machine power supply). 
  When the panel is removed or mounted, be sure to wear protective 
shoes and gloves to prevent injury with the edge of the panel.