16
5 Unpacking and Inspection
5.1 Unpacking
• The EV-Charger undergoes 100% testing and inspection before shipping from
the manufacturing facility. However, transport damage may still occur. Before
unpacking the EV-Charger, please verify that the model and outer packing
materials for damage, such as holes and cracks.
• Unpacking the EV-Charger according to the following figures.
Figure 5-1 Unpacking the Socket Type EV-Charger
Figure 5-2 Unpacking the Plug Type EV-Charger