Operation Method
Boost Settings
Timer Boost
Smart Boost
00:00-00:00
Energy 0.00kWh
End time 00:00
Cancel
Energy(kWh) End time
OK
01
02
03
00
40
01
02
03
00
a
b
c
d
Figure 9-15 Smart Boost setting
The EV-Charger will complete the charging of the EV with desired energy before the preset
end time at maximum charging power and will use the photovoltaic power supply as much
as possible and minimize the use of the grid power. (E.g.: The user needs to charge the EV
to 40 kWh before 10:00 a.m. and complete the settings, the EV-Charger will charge the
EV to 40 kWh before 10:00 a.m., after this desired energy and / or the time has reached,
the charging power will be depended on the surplus power generated by the inverter if the
charging process has not been completed.)
Charging Power
Green mode (6 A)
Eco mode
Max. Power
Min. Power
Energy
from
grid
Energy
from
grid
Time
Start time
Start time
End time
End time
Time
Energy from PV
Charging Power
Max. Power
Min. Power
Energy from PV
Energy from grid
Figure 9-16 Smart Boost