EasyManua.ls Logo

SST F120 - 5 Wire the Detector

SST F120
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
January, 2016 120-25
Model F120 UV/IR Flame Detector
4. Run the cable assembly to the location of the ame detector.
5. Use a suitable cable gland with a 3/4 inch NPT male thread installed in the conduit
opening of the ame detector.
6. Run the wires through the cable gland and through the rear housing of the ame
detector. Tighten the cable gland and seal.
5. Wire the Detector

Table of Contents