44 72-0908E OM FL28C REV B www.stryker.com
Return To Table of Contents
Fixed Two Stage I.V. Pole, Foldable - FA64171
E
G
A
B
G
C
The fixed two stage I.V. pole FA64171 is a permanently attached, telescoping I.V. pole. The extension of the telescoping
section provides a second height position. The I.V. pole can fold into a storage position.
WARNING
The scale and bed exit systems must be adjusted if this accessory is added when either system is in operation. Refer to
the “Add / Remove Equipment” procedure (page 22).
Tools Required:
• Ratchet with a 7/16” and 1/2” Socket
• 7/16” and 1/2” Combination Wrench
• #2 Phillips Screwdriver
I.V. POLE INSTALLATION
Note: The I.V. pole can only be installed on the right side of the head end of the bed.
1. Remove the head board.
2. Using a 1/2” combination wrench, remove the bolt (A) and spring washer (B) from the base of the I.V. pole.
3. Install the I.V. pole into the socket and attach it using the bolt and spring washer removed in step 2.
Note: The bolt is coated with “Scotch Grip”. The coating becomes less effective once the bolt is tightened and removed
thereafter. Replace the bolt if the I.V. pole is removed and reinstalled in another socket or bed.
4. Using a 1/2” combination wrench, remove the two nuts (D) and bolts (C).
5. Install the storage plate (G) and secure with the bolts and nuts removed in step 4.
6. Reinstall the head board.
I.V. POLE OPERATION
1. Lift and pivot the pole from the storage position and push down
until it is locked into the receptacle.
2. To increase the height of the pole, pull up on the telescoping
portion (E) until it locks into place.
3. Rotate the I.V. pole hangers (F) to the desired position and hang
the I.V. bag(s).
WARNING
The weight of the I.V. bags must not exceed 40 lb (18 kg).
4. To store the I.V. pole, turn the latch (G) clockwise until the
telescoping section (E) lowers. Lift up on the pole to remove
it from the receptacle. Fold the pole down and store it on the
bracket.
D
F