5. Feed the ground through the plastic retaining nut (E) (Figure 15).
6. Disconnect the power cord quick connect (F) from the power supply (Figure 15).
7. Feed the two pin connector through the nut (E) (Figure 15).
8. Remove and discard the power cord (AV) (Figure 15).
9. Reverse steps to reinstall.
NNoottee
• During reinstall, first assemble the power cord ground star washers and nut, and then the power supply ground star
washers and nut.
• During reinstall, make sure to align the Velcro® patches.
• After installation, remove the zipper pull tool or equivalent from the zipper.
• Make sure that the watershed covers the zipper.
10.Verify proper operation before returning the product to service.
BBeedd iinntteeggrraattiioonn ccaabbllee ccoonnnneeccttoorr rreeppllaacceemmeenntt
TToooollss rreeqquuiirreedd::
• Zipper pull tool or equivalent
• 1” Combination wrench or socket
PPrroocceedduurree::
1. See
Foot box cover access
(page 31).
2. Using your fingers, disconnect the bed integration cable connector (AP) from the foot box by rotating the turn-lock
counterclockwise (Figure 16).
3. Using a 1” combination wrench, remove the plastic retaining nut (F) on the bed integration cable connector securing it to
the foot box. Save the nut.
4. Disconnect the can inner cable (AT) from the main board (connector J) (Figure 16).
2971-009-002 Rev D.0 39 EN