Maintenance Checklist STULZUltraSonic-SystemforDirectRoomHumidicationBNB-
17. Maintenance Checklist
Job to be performed Page Procedure and maintenance interval Date
Signature
Date
Signature
Date
Signature
OK* OK* OK*
Visual inspection 48 - Tightness of connections of water-bearing parts
- Cleanness of filter
- Outside of unit for impurities
- Water tank for impurities, damage, microbial growth and
corrosion
- Humidity sensor and ventilation slots for impurities
- Solenoid valves for deposits
Every 3 months**
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
51 - Check oscillators for deposits
- Check mist guide pipes for deposits
Every 6 months**
☐
☐
☐
☐
☐
☐
Leak test 48 Inspect all screw and push-in connections for leaks and a secure fit
Every 6 months**
☐
☐
☐
Clean the air filter 50 Open filter drawer, clean filter
Every 6 months**
☐
☐
☐
Clean the water tank 51 Remove housing cover and retaining plate together with mist
guide pipes (open water tank), clean and
disinfect with hydrogen peroxide solution
Every 6 months**
☐
☐
☐
☐
☐
☐
Inspect the electrical
system
52 Remove cover of control system and check electrics
Every 6 months**
☐
☐
☐
Replace float switches 55 Open water tank, remove float switch and fill valve unit
Approx. every 10,000 operating hours**
☐
☐
☐
Replace oscillators 58 Remove water tank, disconnect cables, detach oscillators
Approx. every 10,000 operating hours**
☐
☐
☐
*
Delete as applicable
**
Time intervals may be shorter in isolated cases, depending on local conditions