EasyManua.ls Logo

Stulz BNB Series - 11.5.2. Replacing the Solenoid Valve and Float Switch

Stulz BNB Series
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN / 10-2015 / 1000683 © STULZ GmbH, Hamburg
-
84
-
Maintenance STULZUltraSonic-SystemforDirectRoomHumidicationBNB-
11.5.2. Replacing the solenoid valve and oat switch
3
Unscrew the threaded joint of the water
supply pipe.
2
Unscrew the Phillips screw next to the
right-handoatswitch.
1
Perform steps 1-10 from
section "11.5. Inspect the electrical sys-
tem" on page 80.
4
Completely remove the panel.
5
Slacken the Phillips screw and take the
unit out of the housing.
6
Rotatethettingandtakeoutoftheunit,
andremovethellvalve.
7
Checktheopen/closedsignalfromtheoat
switches and replace if necessary.
Item
Description
8 Water tank
9 Nebulizer print plate
10 Fill valve
11 Coilllvalve
12 Float switch for low water
13 Float switch for water supply
9
8
12
11
10
13
a)Floatswitchforlowwater(12)FS2
-Upperlevel:open
-Lowerlevel:closed
b)Floatswitchforwatersupply(13)FS1
-Upperlevel:closed
-Lowerlevel:open

Table of Contents

Related product manuals