© STULZ GmbH, Hamburg EN / 10-2015 / 1000683
-
57
-
STULZUltraSonic-SystemforDirectRoomHumidicationBNB- Start-up
8. Start-up
All steps from section "7. Installation" on page 33 must have been completed prior to start-up.
CAUTION
Electrical connections are secure.
After transport/delivery, check that electrical connections are secure and re-tighten if necessary.
WARNING
CAUTION
No obstacles in the blow-out area.
There must not be any obstacles in the blow-out area of the unit. Risk of condensation!
NOTICE
CAUTION
Stationary water in pipes.
Donotoperatethehumidierwithstationarywaterinthepipes.
NOTICE
CAUTION
Alignment with airow.
Alignthehumidierinthedirectionoftheairow.
NOTICE
CAUTION
Water and power supply.
Makesuretheultrasonichumidierissuppliedwithelectricalpoweranddemineralizedwater.
NOTICE
CAUTION
Space for maintenance and repair work.
The installation clearances from section "7.2. Installation clearances" on page 36 must be adhered to.
CAUTION
Check all connections.
Route and connect all power cables and water supply pipes correctly, securely and safely.
NOTICE
CAUTION
Operation < 0°C.
Donotoperatethehumidieriftheroomtemperaturedropsbelow0°C!
●
Drain the water tank of the unit.
NOTICE