EasyManua.ls Logo

Stulz BNB Series - Waste Water Connection

Stulz BNB Series
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN / 10-2015 / 1000683 © STULZ GmbH, Hamburg
-
44
-
Installation STULZUltraSonic-SystemforDirectRoomHumidicationBNB-
7.4.2. Waste water connection
UltrasonichumidiersfromtheBNBmodelserieshavetwowastewaterconnections.Athirdoneisadd-
ed if they are installed in a safety tray.
CAUTION
Pressureless drainage.
Thehumidierdrainswithoutpressure.
Make sure the outlet allows free drainage.
Note
CAUTION
Flush valve.
OnlyinstalltheushvalveintheDRAINAGEPIPE!
Note
CAUTION
Contaminated water pipes.
Filings and dirt must not get into water pipes!
All pipes must be cleaned before they are connected to the unit.
NOTICE
CAUTION
Position of valves.
Always install valves below the unit.
NOTICE
CAUTION
Direction of ow of solenoid valve.
Payattentiontothedirectionofowwhenttingthesolenoidvalve.
NOTICE
CAUTION
Resistant materials.
Theconnectionbetweenthedemineralizationsystemandthehumidiermustconsistofamaterialthat
is resistant to demineralized water.
Only use approved materials. See "4.7. Application limits" on page 20.
NOTICE
CAUTION
Regulations from water supply companies.
Regulations from water supply companies must be complied with.
WARNING

Table of Contents

Related product manuals