EN / 10-2015 / 1000683 © STULZ GmbH, Hamburg
-
26
-
Design and planning STULZUltraSonic-SystemforDirectRoomHumidicationBNB-
5. Design and planning
Thissectiondealsonlybrieywiththemainaspectsofdesignandplanning.Youcanobtainmore
detailed information in our STULZ UltraSonic Planning Guide.
Please refer to our STULZ UltraSonic Planning Guide for more information.
Visit our e-stulz page on the internet at www.stulz.de/en/e-stulz.
Hereyoucandownloadourcerticates.
Foreffectiveplanning,youmusttakeaccountofdifferentsizesandboundaryconditions:
1) Installation conditions
●
Location(elevationabovesealevel)
●
Room volume
●
Room air temperature
●
Relativeandspecicroomairhumidity
●
Airchangerate(forcedventilation,airchangesinducedbyairtransfer)
●
Ambient air quality
●
Power connection
●
Water connection
●
Water quality of drinking water
2) Process requirements
●
Type or design
●
Application
●
Water quality of demineralized drinking water
●
Heatloads(e.g.wasteheatfrommachinery)
●
Requiredroomclimateafterhumidication(temperature,relativeandspecichumidity)
●
Are there moisture sinks or moisture reservoirs
●
Humidierdistance
3) System selection
●
Energyefciency
●
Acoustics
●
Hygiene
●
Running costs
●
Purchase costs