EasyManua.ls Logo

Stulz BNB Series - Page 34

Stulz BNB Series
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN / 10-2015 / 1000683 © STULZ GmbH, Hamburg
-
34
-
Installation STULZUltraSonic-SystemforDirectRoomHumidicationBNB-
CAUTION
Load-bearing wall.
Thewallmustbeabletobeartheweightofthehumidier.
NOTICE
CAUTION
Frost protection.
Protect the entire system from frost.
NOTICE
CAUTION
Connection elements.
Only use connection elements of approved materials for installation.
Also see "4.7. Application limits" on page 20.
NOTICE
CAUTION
Fire/smoke detectors
Donotexposere/smokedetectorsinstalledintheroomtoaerosols,asthismaytriggerthem.
Note
CAUTION
Minimum distance from persons.
Persons in the fan blow-out area must maintain a minimum distance of 5000 mm.
See section "5.1.Humidierdistance"onpage27.

Table of Contents

Related product manuals