EasyManua.ls Logo

Suez CheckPoint Pharma - Page 100

Suez CheckPoint Pharma
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CheckPoint Pharma and CheckPoint
e
Operation and Maintenance Manual
SUEZ © 2018 100 of 112 DLM 97200-03 EN Rev. A
3. Disconnect the sample inlet, bypass, and waste outlet tubing from the Sensor.
4. Select the Maintenance menu.
5. Select Diagnostics.
6. Select Pump.
7. Turn the pump on and let it run for 10 minutes.
8. Stop the pump.
9. Power off the Sensor by pressing the button.
10. Then, turn off the breaker, unplug the power cord, or remove the battery.
NOTE: You must remove the battery before shipping the Sensor.
11. Disconnect any wiring or cables connected to the I/O ports, including an Ethernet cable or
4-20 mA wiring (if applicable).
12. If the Sensor is mounted to a wall bracket, remove it from the bracket by gently but firmly pushing
up on the Sensor until it comes free of the bracket.
13. The Sensor is now ready to be packaged in the original shipping materials.

Table of Contents