CheckPoint Pharma and CheckPoint
e
Operation and Maintenance Manual
SUEZ © 2018 58 of 112 DLM 97200-03 EN Rev. A
Figure 18: The Reducing Ferrule After Installation
2. Connect the tubing to the barbs on the Waste and Bypass ports, and put the other end of the
tubing in a suitable waste container or drain. The accessories kit provides a tee to join the tubing
from the Waste and Bypass ports if you want to run a single length of tubing to the drain.
Step 5: Install the Printer
1. Follow the manufacturer’s instructions for setting up the printer.
2. Connect the USB cable from the printer to the USB connection on the CheckPoint instrument.
(For a list of SUEZ recommended printers, go to our website.)