EasyManua.ls Logo

Suez CheckPoint Pharma - Installation Guide; Unpack and Inspect the Sensor

Suez CheckPoint Pharma
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CheckPoint Pharma and CheckPoint
e
Operation and Maintenance Manual
SUEZ © 2018 45 of 112 DLM 97200-03 EN Rev. A
Chapter 4 Installation
Unpack and Inspect the Sensor
Open the shipping box and verify that it contains the following:
Sievers CheckPoint Pharma (or CheckPoint
e
) Portable/On-Line TOC Sensor
Accessory package containing:
CheckPoint Pharma and CheckPoint
e
Portable/On-Line TOC Sensors Operation and
Maintenance Manual (CD-ROM)
CheckPoint Pharma and CheckPoint
e
Portable/On-Line TOC Sensors Quick Standard
Protocols Operating(CD-ROM)
Certificate of Calibration
Accessories:
Mounting bracket
1/8" sample inlet tubing (with fittings)
1/8" sample waste tubing (2, including “tee” and short tubing to route to tee)
AC conduit ground wire, 16-14 American Wire Gauge (AWG)
Flathead screwdriver
Panel for use with power conduit
Terminal block (for wiring power conduit)
Stainless steel metric tubing converter (1/4-in-to-6-mm tube)
1/4" to 1/8” reducing adapter
Reducing ferrule and knurled nut
1/4" cap for sample line
ESD wrist strap
Flow rate calibration kit (Bypass port plug; drain tubing; graduated cylinder)
Adhesive tubing clip
Power Cord
Optional items:
Vial Sampling Kit
Low-Pressure Sampling Kit

Table of Contents