EasyManua.ls Logo

Suez CheckPoint Pharma - Installation Guide; Unpack and Inspect the Sensor

Suez CheckPoint Pharma
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CheckPoint Pharma and CheckPoint
e
Operation and Maintenance Manual
SUEZ © 2018 45 of 112 DLM 97200-03 EN Rev. A
Chapter 4 — Installation
Unpack and Inspect the Sensor
Open the shipping box and verify that it contains the following:
• Sievers CheckPoint Pharma (or CheckPoint
e
) Portable/On-Line TOC Sensor
• Accessory package containing:
• CheckPoint Pharma and CheckPoint
e
Portable/On-Line TOC Sensors Operation and
Maintenance Manual (CD-ROM)
• CheckPoint Pharma and CheckPoint
e
Portable/On-Line TOC Sensors Quick Standard
Protocols Operating(CD-ROM)
• Certificate of Calibration
• Accessories:
• Mounting bracket
• 1/8" sample inlet tubing (with fittings)
• 1/8" sample waste tubing (2, including “tee” and short tubing to route to tee)
• AC conduit ground wire, 16-14 American Wire Gauge (AWG)
• Flathead screwdriver
• Panel for use with power conduit
• Terminal block (for wiring power conduit)
• Stainless steel metric tubing converter (1/4-in-to-6-mm tube)
• 1/4" to 1/8” reducing adapter
• Reducing ferrule and knurled nut
• 1/4" cap for sample line
• ESD wrist strap
• Flow rate calibration kit (Bypass port plug; drain tubing; graduated cylinder)
• Adhesive tubing clip
• Power Cord
• Optional items:
• Vial Sampling Kit
• Low-Pressure Sampling Kit

Table of Contents