CheckPoint Pharma and CheckPoint
e
Operation and Maintenance Manual
SUEZ © 2018 85 of 112 DLM 97200-03 EN Rev. A
Chapter 7 — Maintenance
To ensure optimum performance of the CheckPoint, routinely replace Sensor consumables and
maintenance items. Refer to the recommended maintenance schedule below. The UV lamp and
sample pump tubing (including pump heads) MUST be purchased from SUEZ.
If you need additional assistance, contact Technical Support or your local service provider. Training
by a qualified service technician also can be provided.
NOTE: This chapter covers replacement instructions for routine maintenance items that are replaced
on a regular schedule. Instructions for non-routine maintenance items are provided in the packaging
for those items.
For your convenience, the following tracking logs are provided to ensure that consumables are
periodically replaced and maintenance periodically performed: Table 4: Consumables Replacement
Schedule on page 86 and Table 5: CheckPoint 2-Year Maintenance Worksheet on page 93.
Figure 33: Interior Overview of the Sensor