5. Removal & Installation of Engine
5-4
Remove AC generator and crankshaft position sensor
coupler.
Remove the start motor wire from the start relay.
Remove O
2
sensor wire coupler.
Start engine for the pipeline to be exhausted within the
residual pressure, the engine flameout, relaxing fuel
tube folder, open for fuel tube.
Caution
€ Demolition for the pipeline will be required for
residual pressure in the pipeline to divest, or use
the folder surrounds the tubing to prevent petrol
splash.