EasyManua.ls Logo

Terex RT200-1 - Hoist-Line Reeving

Terex RT200-1
212 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Final seating of the wedge is accomplished by making lifts of gradually
increasing loads. avoid imposing shock loads on the rope until the wedge is
firmly in place.
5. After the wedge has been firmly seated, a short length (6 inches) of the cable
should be secured to the free end of the wire rope to act as a stop as shown.
DO NOT clamp the free end to the load supporting end as this will weaken the
rope.
55P/N 12261-319 REVISED: August 2012
Courtesy of Crane.Market

Table of Contents

Related product manuals