CABLE REEVING When reeving the machine for any job, remember that hoisting and
lowering speeds decrease as the number of parts of line increases. For the most efficient
use of the machine, it is desirable to use the minimum number of required parts for lifting
the anticipated loads.
Never use less than the number of parts called for by the load rating chart. The
minimum required number of parts is determined by referring to the load rating
chart.
This machine incorporates a “Quick Reeving” boom head and block which do not require
removal of the wedge and socket from the rope in order to change the reeving. Removal of
two pins in the boom head and three in the hook block will allow the wedge and socket to
pass through.
NOTE: If a socket is changed or replaced, or if you are changing hook block
weights, it is IMPORTANT to use the correct socket.
59P/N 12261-319 REVISED: August 2012
Courtesy of Crane.Market

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Terex RT200-1 and is the answer not in the manual?

Terex RT200-1 Specifications

General IconGeneral
BrandTerex
ModelRT200-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals