EasyManuals Logo

Terex RT200-1 User Manual

Terex RT200-1
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #123 background imageLoading...
Page #123 background image
Boom Restraint
The boom must be stowed in the boom rack before transporting the crane.
The boom extend sections should be restrained to prevent gradual roll-out when
transporting the crane on a semitrailer. The hydraulic system will not hold the sections
against the hard breaking jolts while the crane is being transported.
Restrain the boom extend sections by snugging the hook block against the boom head, or
secure the boom head back to the base section of the boom with chains or cable. An
extended(ing) boom can cause substantial damage.
Transportation
122 P/N 12261-319 REVISED: August 2012
Courtesy of Crane.Market

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Terex RT200-1 and is the answer not in the manual?

Terex RT200-1 Specifications

General IconGeneral
BrandTerex
ModelRT200-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals