4. OPERATIONAL FLOW CHART
P.23
1
dengen
1
dengen
1
dengen
1
dengen
1
Turning on the main power switch
1
dengen
1
dengen
2
Mounting the rotor
1
dengen
1
dengen
3
Preparing sample tubes
1
dengen
1
dengen
P.26
4
Loading
sample tubes
1
dengen
P.33
1
dengen
5
Setting the operational conditions
1
dengen
P.35
1
dengen
6
Starting operation
1
dengen
P.37
1
dengen
7
Ending operation
1
dengen
P.
37
1
dengen
1
dengen
1
dengen
8
Removing sample tubes
1
dengen
P.21
1
dengen
9
Dismounting the rotor
1
dengen
P.19
1
dengen
10
Turning off the main power switch
P.19
P.21
※
For repetitive operations, restart the operation with "3. Preparing sample tubes" on the above
ow chart of the operation sequence after removing sample tubes.
※
To continue operation after replacing the rotor, restart with the operation sequence of
"2.Mounting the rotor" on the ow chart after removing the operative rotor.