3.1.3 Initial Uncrating
CAUTION! Sharp Objects: Be sure to wear gloves when uncrang mill. Failure to do so may result in
serious injury.
Use strap snips and a small pry bar to open and disassemble shipping crate. Remove top of crate
rst, followed by four sides. Figure 3.2 shows crate removed.
3.1.4 Shipping Damage or Shortages
Once received, inspect and note any shipping damage that may have occurred during transit. Also
check received goods against packing list. Any damage claims or shortages must be addressed within
30 days of receipt.
3.2 Installation Sequence
If PCNC mill was purchased with addional accessories or oponal kits, the following installaon
sequence is recommended:
1. Basic installaon (see Basic Installaon Procedure later in this chapter)
2. Installaon validaon (see Validate Basic Installaon later in this chapter)
3. 4th Axis
4. Power Drawbar
5. Automac Tool Changer (ATC)
6. Load Meter
7. Full Enclosure
NOTE: For installaon items 3-7 (see above),
refer to product-specic instrucons.
3.3 Basic Installation Procedure
Follow the steps below to complete basic
mill installaon.
3.3.1 Partial Stand Assembly
The pedestal of the stand should be
assembled rst. Refer to documentaon
that ships with the stand for informaon
on assembly. Do not install chip pans or
backsplash unl aer mill has been lied
onto the stand.