Chapter 1
9
UM10349_PCNC1100_Manual_0916A
Preface
3.3.5 Li and Move Mill 27
3.3.5.1 Remove Mill from Pallet 27
3.3.5.2 Liing Bar Kit 27
3.3.5.3 Liing from Below 27
3.3.5.4 Moving Kit (PCNC 770 Only) 28
3.3.5.5 Lowering Mill onto Stand 28
3.3.6 Install Tool Tray (PCNC 1100 only) 28
3.3.7 Install Drip Tray 28
3.3.8 Install PathPilot Controller 29
3.4 Installaon of Add-ons 31
3.4.1 Stand 31
3.4.2 Machine Arm 31
3.4.2.1 Mouse, Keyboard, and Jog Shule 31
3.4.3 USB Bulkhead Port 31
3.4.4 Manual or Automac Oiler 31
3.4.5 Coolant System 31
3.5 Essenal Controls Overview 32
3.5.1 E-stop, Start, Reset, and Power 32
3.6 Power O/Power On Procedure 33
3.6.1 Inial PathPilot Controller Conguraon 34
3.7 Validate Basic Installaon 34
3.7.1 Verify Spindle Funcon 34
3.7.2 Verify Limit Switch Funcon 35
3.7.3 Verify Axis Funcon 36
3.7.4 Coolant On/O 36
3.7.5 Installaon Troubleshoong 36
3.8 Controller Customizaon 37