Chapter 1
8
UM10349_PCNC1100_Manual_0916A
Preface
Table of Contents
1. Overview 20
1.1 Specicaons (PCNC 1100) 21
2. Site Planning and Prep 22
2.1 General Site Requirements 22
2.1.1 Space Requirements 22
2.2 Electrical Requirements 22
2.2.1 Grounding 22
2.2.2 Plug Paern 22
2.2.3 Ground Fault Interrupter (GFI) Use 23
2.2.4 Electrical Noise 23
2.2.5 Opons for Electrically Non-conforming Sites 23
2.2.5.1 Buck-Boost Transformer 23
2.2.5.2 Step-up/Step-down Transformer 23
2.2.5.3 Quick 220
â„¢
Voltage Converter Power Supply 23
3. Installaon 24
3.1 Receiving, Uncrang, and Inial Inspecon 24
3.1.1 Shipment Arrival 24
3.1.2 Moving the Crate 24
3.1.3 Inial Uncrang 25
3.1.4 Shipping Damage or Shortages 25
3.2 Installaon Sequence 25
3.3 Basic Installaon Procedure 25
3.3.1 Paral Stand Assembly 25
3.3.2 Remove Tool Tray (PCNC 1100 only) 26
3.3.3 Remove Accessory Tool Box 26
3.3.4 Assembling Y-Axis (PCNC 1100 only) 26