2
InstallingtheRollBar
Partsneededforthisprocedure:
1Rollbar
6
Flange-headbolt(1/2x1-1/4inches)
Procedure
1.Applymedium-grade(service-removable)
thread-lockingcompoundtothethreadsofthe6
ange-headbolts(1/2x1-1/4inches).
2.Aligneachsideoftherollbarwiththemounting
holesoneachsideofthemachineframe(Figure
4).
g009812
Figure4
1.Rollbarmountingbracket
2.Flange-headbolt(1/2x
1-1/4inches)
3.Securetherollbarmountingbrackettothe
machineframeusing3ange-headbolts(1/2x
1-1/4inches)oneachside(Figure4).
4.Torquetheange-headbolts(1/2x1-1/4inches)
to115N∙m(85ft-lb).
3
CheckingtheFluidLevels
andTirePressure
NoPartsRequired
Procedure
1.Checktheengine-oillevelbeforeandafter
yourststarttheengine;refertoCheckingthe
Engine-OilLevel(page39).
2.Checkthetransaxle/hydraulic-uidlevelbefore
yourststarttheengine;refertoCheckingthe
Transaxle/Hydraulic-FluidLevel(page55).
3.Checkthebrake-uidlevelbeforeyourststart
theengine;refertoCheckingtheBrake-Fluid
Level(page50).
4.Checkthecoolantlevel;refertoCheckingthe
Engine-CoolantLevel(page48).
5.Checktheairpressureinthetires;referto
CheckingtheTirePressure(page19).
4
BurnishingtheBrakes
NoPartsRequired
Procedure
Toensureoptimumperformanceofthebrakesystem,
burnishthebrakesbeforeuse.
1.Bringthemachineuptofullspeed,applythe
brakestorapidlystopthemachinewithout
lockingupthetires.
2.Repeatthisprocedure10times,waiting1minute
betweenstops,toavoidoverheatingthebrakes.
Important:Thisprocedureismosteffective
ifthemachineisloadedwith454kg(1,000
lb).
12