e-STUDIO163/203 ADJUSTMENT December 2005 © TOSHIBA TEC
3 - 34
[B] Connection for developer bias adjustment
Fig. 3-19
[C] Connection for main charger adjustment
Fig. 3-20
(
-
)
terminal:
Connect with the white cable
(
+
)
terminal:
Connect with the black cable
Front cover opening/closing switch
Ground to the
machine frame
(
green cable
)
Front cover opening/closing switch
Ground to the
machine frame
(
green cable
)
(
-
)
terminal:
Connect with the white cable
(
+
)
terminal:
Connect with the
red cable
(
thick line
)