EasyManua.ls Logo

TRENDnet TEG-240WS - Installation and Setup; UNPACKING AND INSTALLATION

TRENDnet TEG-240WS
77 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
UNPACKING AND INSTALLATION
This chapter provides unpacking and installation information for the
Switch.
Unpacking
Open the shipping cartons of the Switch and carefully unpacks its
contents. The carton should contain the following items:
TEG-240WS 24-Port Gigabit Web Smart Switch w/ 2 Shared
Mini-GBIC Slots
Multi-Language Quick Installation Guide
CD-COM (Utility & User’s Guide)
Power Cord
Rack Mount Kit (Rubber Feet, Screws and Mounting Brackets)
If any item is found missing or damaged, please contact your local
reseller for replacement
Installation
The site where you install the hub stack may greatly affect its
performance. When installing, consider the following pointers:
Install the Switch in a fairly cool and dry place. See Technical
Specifications for the acceptable temperature and humidity operating
ranges.
Install the Switch in a site free from strong electromagnetic field
generators (such as motors), vibration, dust, and direct exposure to
sunlight.
Leave at least 10cm of space at the front and rear of the hub for
ventilation.

Other manuals for TRENDnet TEG-240WS

Related product manuals