7. Gauge Certificate. New gauges are shipped with a gauge certificate
denoting the radioactive material used in the gauge. The original
gauge certificate should be on file and a copy carried with the gauge at
all times.
8. Transport Package Certification. The regulations require that each
shipper of a (Specification 7A) Type A package “must maintain on file
for at least one year after the latest shipment” testing methods and
results for the Type A package. Troxler has provided this document,
entitled “Testing Results for Type A Package for the 3440...” with the
3440 documentation.
9. Transportation – Bill of Lading. U.S. DOT regulations require
properly prepared shipping documents when transporting a gauge (see
Appendix E).
10. Emergency Procedures. The telephone number of the licensing
agency and procedures for reporting incidents should be kept on file
for the convenience of concerned personnel.
11. Notice to Employees Poster. A copy of this notice should be on file.
A facsimile of this notice is on page D–6. For display requirements,
see the Notice to Employees section on page D–3.