- 59 -
BROW N
8.6.2 Indoor Unit Terminal Box CUE-1000A…1400A
8.7 Finishing the Job
• Hide the tubing wherever possible.
• Make sure that the drainage tube slopes downstream along its entire length.
• Insulate tubing connections with insulation materials.
• Fasten tubes to the outside wall.
• Seal the hole through which the cables and tubing are passing.
• Connect the air conditioner to the power source. Check all air conditioning operating
modes. Consult the user manual.
8.7.1 Check List
Follow this check list:
• Do all the remote control buttons function properly?
• Is the I/R receiver working properly?
• Does the drainage work?
• Are there unusual noises or vibrations during operation?
• Is noise, drain water or air flow from the unit likely to disturb the neighbors?
• Are there any gas leakages?