8.6.2 Indoor Unit Terminal Box CUE-1000A…1400A
8.7 Finishing the Job
Hide the tubing wherever possible.
Make sure that the drainage tube slopes downstream along its entire length.
Insulate tubing connections with insulation materials.
Fasten tubes to the outside wall.
Seal the hole through which the cables and tubing are passing.
Connect the air conditioner to the power source. Check all air conditioning operating
modes. Consult the user manual.
8.7.1 Check List
Follow this check list:
Do all the remote control buttons function properly?
Is the I/R receiver working properly?
Does the drainage work?
Are there unusual noises or vibrations during operation?
Is noise, drain water or air flow from the unit likely to disturb the neighbors?
Are there any gas leakages?