4. Installing the X-ray Unit: Base Stand Type
62 Green X / X18 (Model: PHT-75CHS) Installation Manual
4.7 Leveling the X-ray Unit
To level the equipment using a spirit level:
Required Tool
T-shaped Hex
Wrench
8 mm / 0.3”
Spirit Level N/A
1. Prepare a spirit level.
2. Turn the rotating unit clockwise so that the X-ray tube head faces the front.
3. Loosen eight screws with a T-shaped hex wrench.