EasyManua.ls Logo

Vatech Green X - Leveling the Equipment

Vatech Green X
164 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Installing the X-ray Unit: Wall Mount Type
Green X / X18
(Model: PHT-75CHS) Installation Manual 73
English
5.6 Leveling the Equipment
To level the equipment:
1. Prepare a spirit level.
Parts and
Accessory
Spirit Level N/A
2. Turn the Rotating Unit clockwise so that the X-ray tube head faces the front,
as shown in the figure.

Table of Contents

Related product manuals