Connect port B the bottom I/O module of the second shelf to port A in the
bottom I/O module in the first shelf.
16
Be sure that the blue clips on these connectors point up.
Next, connect network and power cables. Turn on the storage shelves and the
appliance per the required sequence. Verify that all units are functioning correctly.
Connecting the network cables
The networking ports are accessed on the rear panel of the device. The remote
management port is for use by Veritas Technical Support staff or by approved field
113Adding one or more storage shelves to an operating 4TB appliance that does not have any storage shelves
Connecting the network cables

Table of Contents

Other manuals for VERITAS NetBackup 5240

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the VERITAS NetBackup 5240 and is the answer not in the manual?

VERITAS NetBackup 5240 Specifications

General IconGeneral
Language version-
License typeCorporate
License quantity- license(s)
License term in years5 year(s)

Related product manuals