3
Connect one cable to one PDU strip.
4
Connect the other cable to the other PDU strip.
See “Turning on the hardware and verifying operation” on page 49.
Turning on the hardware and verifying operation
The appliance and the storage shelves must be turned on in a specified order. If
the hardware is not turned on correctly the appliance RAID controller may not
recognize some storage units.
49Installation procedures
Turning on the hardware and verifying operation