The following describes the necessary personnel and equipment that are needed
at the installation site:
■ At least one person or a mechanical lift to move the appliance and the storage
shelves.
■ Ethernet and Fibre Channel (FC) cables to connect the appliance to your
corporate network.
■ A USB-keyboard and a monitor to connect to the appliance.
■ A 19-inch rack with dual Power Distribution Units (PDUs) with 120VAC or
220VAC power supplies.
Storage shelf shipping container contents
The appliance and each storage shelf are shipped in separate containers. Each
container includes other boxes and contents. The disk drives are installed into the
appliance and the storage shelf at the factory.
The following items ship within the storage shelf box.
■ Open Me First box, containing
■ Installation flip cards
■ Deployment plan that provides basic information and links to detailed
information
■ Rack mounting template
■ Installation poster
■ Cabling poster
■ Rack rails
■ Two SAS-3 cables
■ Two power cords
■ Bezel
Appliance shipping container contents
The appliance and each storage shelf are shipped in separate containers. Each
container includes other boxes and contents. The disk drives are installed into the
appliance and the storage shelf at the factory.
The following items ship within the appliance box.
Preinstallation requirements
Storage shelf shipping container contents
16