3
Connect one cable to one PDU strip that is next to one power connector on
the storage shelf.
4
Connect the other cable to the other PDU strip that is next to the other power
connector on the storage shelf.
Turning on the hardware and verifying operation
The appliance and the storage shelves must be turned on in a specified order. If
the hardware is not turned on correctly the appliance RAID controller may not
recognize some storage units.
115Adding one or more storage shelves to an operating 4TB appliance that does not have any storage shelves
Turning on the hardware and verifying operation