EasyManuals Logo

VERITAS NetBackup 5240 Hardware Installation Guide

VERITAS NetBackup 5240
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #56 background imageLoading...
Page #56 background image
To turn on the appliance
1
Verify that all connected storage shelves function correctly. Use the LED
information in the procedure that explains how to turn on the storage shelves.
2
On the front, right, side of the appliance press the Power button.
3
Verify that the bottom LED in all 12 disk drive slots are green.
The following table provides details of the disk drive LEDs.
DescriptionStatesLED number,
name, and
location
No fault
Disk fault
A RAID rebuild is in progress
Off
Solid amber
Blinking amber
1, Status LED, top
Power is on and the disk has spun
down
Power is on but there is no disk activity
Power is on and the disk is spinning up
Commands are processing
Off
Solid green
Blinking green
Blinks green occasionally
2, Activity LED,
bottom
Installation procedures
Turning on the hardware and verifying operation
56

Table of Contents

Other manuals for VERITAS NetBackup 5240

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the VERITAS NetBackup 5240 and is the answer not in the manual?

VERITAS NetBackup 5240 Specifications

General IconGeneral
Language version-
License typeCorporate
License quantity- license(s)
License term in years5 year(s)

Related product manuals