3. Move the slings or chains to the lift rail side that is resting on the skid, Figure 4.9 below.
• Mechanically lift the unit to a point where the side being lifted is just high enough to allow for safe
attachment of the remaining unit legs.
• Move the skid out the way and attach remaining legs.
Figure 4.9 Move Sling to Side Resting on Skid and Lift to Remove Skid and Install Legs