4. Set the upright unit on the ground so that the legs support the unit’s weight.
5. Reposition and add straps and spreader bars to prepare the unit for lifting to installation location, Figure 4.10
below.
• Use the support channels located under the unit to attach straps or chains.
• Spreader bars are still required. Make sure spreader bars are wider than the unit to keep the straps from
pressing on the sides of the unit.
NOTICE
Risk of improper lifting. Can cause equipment damage. Make sure that the spreader bars are wider than the
unit. If the spreader bars are too short, the slings may crush the unit.
The unit is ready to be lifted and moved to its installation location.
Figure 4.10 Rigging 6 and 8 Fan Drycooler for Lifting
Vertiv | Liebert® Drycooler Installer/User Guide
28