44 Operating manual Voltwerk VS 3, 4, 5
6 Commissioning
ENGLISH
DO_BA_2008_121LB_3ENG_BVo 22.2.10
8. Press the button and hold it for longer to confirm the entry.
9. Press the button repeatedly until the required month
appears.
10.Press the button and hold it for longer to confirm the entry.
11.Press the button repeatedly until the required year
appears.
12.Press the button and hold it for longer to confirm the entry.
13.Press the button repeatedly until the required grid type
appears.
14.Press the button and hold it for longer to confirm the entry.
15.Press the button repeatedly until the required country
appears.
DATE
10. __. 2008 The month flashes
DATE
10. 08. 20__ The year flashes
GRID TYPE
TT Grid type information flashes
TT grid: damage caused by missing external fault-current
circuit breaker.
If the device is operated in a TT grid, an external fault-current
circuit breaker is required.
| For TT grids, install an additional external fault-current
circuit breaker.
GRID TYPE
TN
COUNTRY
ITALY The line flashes