46 Operating manual Voltwerk VS 3, 4, 5
6 Commissioning
ENGLISH
DO_BA_2008_121LB_3ENG_BVo 22.2.10
The inverter only functions when a set of parameters is set.
Initialisation of power feed to grid may last 2–3 minutes.
Initialisation of power feed to grid:
audible clicking of the relay
Power feed to grid
Grid power available, standby operation of
inverter
Ready Solar Gen-
erator
Grid Fault Meaning
LED is illuminated
LED is flashing
(LED lights up regularly)
LED is flashing
(brief illumination of the LED every
2 seconds)
LED is off