Transportation
5.3 Tying Down and Transporting the Machine
30
Operator’s Manual | RTLx-SC3 | 5100061327 | 09/2022 | [en-US]
Procedure
1. Make sure that the transport vehicle is capable of handling the weight
and size of the machine. For dimensions and operating weight, see
Technical Data on page 83.
2. Lock the front and rear halves of the machine using the articulated joint
locking bar(1).
wc_gr012168
1
2
3
3
Fig.4: Preparing the machine for transportation
3. Place chocks(2) in of front or behind each drum as shown.
4. Attach steel ropes or chains to the front and rear tie downs(3).
5. Attach the other end of the steel ropes or chains to the transport vehi-
cle.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson RTLx-SC3 and is the answer not in the manual?

Wacker Neuson RTLx-SC3 Specifications

General IconGeneral
BrandWacker Neuson
ModelRTLx-SC3
CategoryConstruction Equipment
LanguageEnglish

Related product manuals