Transportation
Tying Down and Transporting the Machine 5.3
29
[en-US] | 09/2022 | 5100061327 | RTLx-SC3 | Operator’s Manual
Procedure
A lifting eye is used for lifting the machine.
wc_gr012167
1
Fig.3: Articulated joint locking bar
1. Lock the front and rear halves of the machine using the articulated joint
locking bar (1).
2. Attach the lifting devices and equipment to the lifting eye. Do not attach
lifting devices to any other part of the machine.
3. Lift the machine a small distance.
4. Check for stability. If the machine is not stable, lower it, reposition the
lifting devices, and lift the machine a small distance again.
5. Continue lifting the machine as necessary.
5.3 Tying Down and Transporting the Machine
NOTICE
Using parts of the roller other than those specified to tie down the machine
may cause severe damage.
Only use the specified tie downs to secure the machine.
Requirements
Parking brake engaged
Machine shut down
Chocks in place
Steel ropes or chains
5

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson RTLx-SC3 and is the answer not in the manual?

Wacker Neuson RTLx-SC3 Specifications

General IconGeneral
BrandWacker Neuson
ModelRTLx-SC3
CategoryConstruction Equipment
LanguageEnglish

Related product manuals