6.7.1 GROUNDING THE POWDER COATING SYSTEM
1 Only use mains cables with grounding strand!
2 Connect grounding cable with booth and signal ground!
3 Connect grounding cable to an uncoated metal part of the booth!
4 Remove all paint from hooks and other hanger parts!
5 Do not wear non-conducting gloves!
6 Wear electrostatically conductive footwear!
7 The  oor must be electrostatically conductive!
8 Connect  oor and booth with system ground!
The control unit is grounded with the grounding cable supplied. The grounding cable is
secured to the control unit's grounding connection and the rack with the screws provided.

Table of Contents

Other manuals for WAGNER EPG S2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the WAGNER EPG S2 and is the answer not in the manual?

WAGNER EPG S2 Specifications

General IconGeneral
BrandWAGNER
ModelEPG S2
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals