7 OPERATION
7.1 TRAINING THE OPERATING PERSONNEL
The operating personnel must be qualied to operate the entire system.
The operating sta must be familiar with the potential risks associated with improper
behavior as well as the necessary protective devices and measures.
Before work commences, the operating personnel must receive appropriate system
training.
7.2 TASKS
Ensure that:
the regular safety checks are carried out in accordance with chapter 8.2.3;
commissioning is carried out in accordance with Chapters 6.4 and 6.5.
7.3 OPERATION OF THE CONTROL UNIT
P_01743
EPG
SPRINT X
2x
2x
0
%
100
%
kV
80
60
40
20
100
Tri Cor
5
4
3
2
1
120
80
40
20
10
10
20
30
40
50
60
70
80
90
Ø
12
10
11
9
8
m /h
2.0
3.0
0.5
0.3
0.1
1.5
3
5.5
4.5
3.5
2.5
Tri
µA
28 27 30 29 31 32 37 35 2434 36 33
1 2 3 4 20 22 23 18 13 1921
12
8
11
7
10
6
9
25
26
16
17
15
14
5
1 Illuminated display High voltage
– Lights up green
– Display range: 0-100 kV
– Resolution 10 kV
– Single LED display: Nominal voltage
– Bar display: Working voltage