EasyManua.ls Logo

Waters 2545 Binary Gradient Module - Page 45

Waters 2545 Binary Gradient Module
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparing solvent reservoirs 2-19
To perform a dry prime:
1. Fill the syringe with priming solution.
2. Remove the inlet tube and nut from the inlet manifold.
3. Screw the nut from the priming syringe into the port that you want to
prime.
4. Inject the solvent into the manifold.
5. Remove the syringe and reinstall the inlet tube.
Priming the binary gradient module
To prime the binary gradient module:
1. On the front panel, press the Prime button. This action pulls solvent
through the four pump heads, primes the A1 and B1 solvent inlet tubes,
and then primes the pump.
2. To prime other solvent inlet tubes or modify solvent flow rates, in the
MassLynx inlet status page, select the Additional Status tab, and then
select the Chroma button.
3. In the Diagnostics Chromatographic Pump dialog box, select Diagnostics
> Wet Prime.

Related product manuals