Index-4
grub screw 5-42
heater cartridge assembly,
replacing
5-72
removing
5-29
ion optics
1-7
ionization modes
3-2
APCI
1-6, 4-1
APPI
1-6
ESI
1-5
IonSABRE APCI probe
4-2
IP addresses
2-2
isolating source from instrument
5-7
isolation valve, cleaning
5-29
L
LAN card B-26
LC, position of fluidics system diverter
valve
2-9
LC/MS System Check
D-1
leaks, checking for
5-11, 5-58, 5-67,
B-21
LED
monitoring
2-5
operate
2-5
power
2-3, 2-5
status
2-3
liquid trap bottle, emptying
5-3, 5-12
liquid waste line, connecting
B-23
lower bezel air filter
cleaning
5-87
replacing
5-88
low-volume vials, installing
2-7
M
maintenance
safety
5-5
schedule
5-3
mass spectrometer
leaving ready for operation
2-12
mass spectrometer shock hazard
A-4
MassLynx software
1-4
materials of construction
C-1
mobile phases, solvents used in
preparation of
C-3
mode
scanning
1-8
selected ion recording
1-8
monitoring, system instrument LEDs
2-5
MS operating modes
1-8
multi-mode ESCi source
1-2
N
network cables B-25
nitrogen
exhaust, connecting
B-20
supply
connecting
B-18
pressure requirements
iv, 2-2
NW25 tee, connecting
B-5, B-14
O
oil, roughing pump
adding
5-18
changing
5-4
checking level
5-3, 5-17, 5-94
replacing
5-92
opening source isolation valve
5-8
operate LED
2-5
operating modes, MS
1-8
operating source isolation valve
5-7
O-ring removal kit
5-9
O-rings, removing
5-9
P
PEEK terminal block, removing 5-34,
5-73
photomultiplier detection system
1-7
power LED
2-3, 2-5
power supply, connecting to
B-25