SupplementaryinstallationinstructionsforbalancedueDN80/125
Flat roof: Afx the ceiling outlet approx. Ø 130 mm (14) deep
into the roof cover.
Pitched roof: For (12), observe the installation instructions on the
cowl regarding roof pitch.
If an inspection port is required for the balanced ue, insert a
balanced ue with inspection port (3) (allow a length of 250 mm).
Insert roof outlet (7) into the roof from above and secure vertically
with (6) to a rafter or brickwork.
Installtheroofoutletonlyinitsoriginalcondition.Modications
arenotpermissible.
Wet or lubricate all air/ue gas joints prior to installation,
e.g. using a grease without silicone.
Note
Determine distance A. Length of balanced ue (4) must always be
approx. 100 mm longer than distance A. Always trim the ue on the
smooth side, never on the female connection side.
Chamfertheuewithaleaftertrimming.
Distance A
Distance A
Bend Offset
87° Min. 204 mm
45° Min. 93 mm
When installing, slide the separator (8) fully into the female
connection. Push the next balanced ue (4) 50 mm (dim. "S")
into the female connection of the separator and ensure it is fully
secured in this position, e.g. with pipe clamps (5) or with a locking
screw on the air side.
8
4
5
Fit connection adaptor with test nipple (2) to the oil condensing
boiler connection.
Separate the ue via a slide coupling (8)
For inspection purposes (3), undo and move the inspection piece
clamp. Undo and remove the inspection pipe cover.
Inspection piece
(3)
Sliding socket -
(Disconnect device) (8)
Connection adaptor
with test nipple (2)
Sliding socket -
(Disconnect device) (8)
7
650