PRE-COMMISSIONING CHECKS -
APPLIANCE
CAUTION: ISOLATE THE MAINS SUPPLIES
BEFORE STARTING ANY WORK AND
OBSERVE ALL RELEVANT SAFETY
PRECAUTIONS.
14Check that the service and water pipes are
connected correctly.
24 Check that the oil supply is kerosene and
that the pipework is connected correctly to
the oil pump via the supplied flexible oil
hose (see correct routing for flexible hose
on page 27).
4 Turn on the main oil supply valve at the
tank, check the oil supply pipework and
connections. Rectify any leaks.
NOTE: Replace flexible hose at annual
service to prevent possible oil leakage.
34 Check the flue is correctly fitted and the
connections are secure.
44 Check the condensate pipework is
correctly fitted and connected.
4 Check the condensate trap is filled with
water.
54 Check the CH circulating pump is set to 3.
NOTE: The CH circulating pump is preset to
number 3 and should not be altered.
IMPORTANT: If the boiler is not to be
commissioned immediately then:
After successfully completing all of the
checks and any rectification work, close the
water valves, shut off the oil supply and
electrically isolate the boiler.
Complete the installation part of the
Guarantee Registration Card, and complete
a CD10 or equivalent to inform the LABC of
the installation.
PRE-COMMISSIONING CHECKS -
APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR GREENSTAR HEATSLAVE II EXTERNAL 12/18-18/25-25/32
6 720 805 210-01
35
COMMISSIONING

Other manuals for Worcester Greenstar Heatslave II External 12/18

Related product manuals