FINISHING COMMISSIONING -
APPLIANCE
14 Rotate the control box (A) towards you.
4 Slide back into position (B).
24 Refit the top panel (C) and press down to
compress the seal when fitting the
securing screws at each corner.
34 Push the front panel (D) up behind the top
panel and push in at the base to secure
with the screws (E) using the tool povided.
Always apply pressure at the edges of
the boiler panels when securing to avoid
accidental damage.
Handover:
4Complete the Guarantee Registration Card,
Combustion Record (at the rear of this
manual) and CD11 or an equivalent
commissioning form.
4Set up the controls and show the user how
to operate all the controls shown in the User
Guide and all system controls.
4Where applicable, instruct the customer how
to repressurise the system.
4If the appliance is unused and exposed to
freezing conditions, shut off all the mains
supplies and drain the system and boiler.
NOTE: Release drain point (G) to drain the
secondary heat exchanger.
FINISHING COMMISSIONING -
APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR GREENSTAR HEATSLAVE II EXTERNAL 12/18-18/25-25/32
6 720 805 210-01
44
COMMISSIONING
A
1
B
2
D
E
F
3
C
J
G
E